Bedroom Renovation for Home Remodeling
So now were coming into the part of the home that we haven’t yet completed. This is the path to the guest bedroom. This stairwell was a closet. Now you can see that the walls have been sheetrocked and some of the tape has gone on the nail holes. All these seems between the sheetrock have to be floated. Once this whole wall is tape and floated three times, and sanded in between each time, then the texture will go on. After the texture, the wall will get painted and then faux finished. This is the guest bedroom, and the main thing I want to show you in this room is that we added this wall, which is the wall to the stairwell. And then we added this wall to create a closet. The room at one time came to here, and we took off the end of the room in order to add in a closet. This closet is going to be very organized and neat. Now what we have to do is have these walls taped, floated and textured, and have it painted and faux finished. And we have a door that will go here and a door that will go to the entrance of the room. This is an interesting little thing you can do in your house. This is an attic space that is a very large attic space and its great to have that extra storage. Most people just have the sort of rafters that could become an attic space but nothing’s done with it. That’s inside the closet here.