Installing Vented Top Row Flashing

Viewing videos requires the latest version of Adobe's Flash Player.
Get the latest Flash player.
Showing 1-5

Part of the video series: How to Roof a House

Summary: Learn about installing vented top row flashing on a metal roof in this free roofing instruction video.

Views: 1,377 | Tags: diy, construction, house, install, metal, steel, roofing, stone-coated, roof


About the Expert
Contact: allmet.com

Tom Shean Tom Shean has been in the Construction Industry for more than 12 years. read more

Conversations About This Video

  • Comments
    (0 comments)
  • Questions & Answers
    (0 questions) (0 answers)
Be the first to comment on this video.
Have a question about this video topic? Ask our community members and let them share their knowledge with you!
Ask A Question

Video Transcript

Installing Vented Top Row Flashing

Hi, I'm Tom Shean and today on behalf of Expert Village I'm going to show you how to install a metal roof. The last full panel course is cut and installed. Vented top row flashing is then cut and installed as wall flashing. In snow climates rich foam should be installed under this flashing. Again, this fastens to the wall a minimum 2 foot on center and down through the tile at a minimum of 18 inches on center. The top edge is formed as a gum edge and then caulked. The barrel holes of the eaves in the continental tile should be closed in to prevent the vermin and inclement weather from entering. Eave foam or metal bird edge is placed along the top of the first batten, extended fascia board or FGW. Carefully align the profiles with the panel which is easily accomplished by laying a reversed panel against the eave batten. Foam closures should temporarily fastened with a galvanized nail every other profile. The closure strip should be set in a bed of caulking for additional protection.

Building & Remodelin... Ads

Community Members who...

  • Favorited this Video
  • Rated This Video

Check out what people are watching now
left_arrow right_arrow